Ask Us About the Strathcona & Crystal Sidewalk Installation
Consultation has concluded
Ask us your questions as we work through this project! We will install curbs, gutters, sidewalks, crosswalks, and street lighting along portions of the north side of Strathcona Road and the east side of Crystal Drive.
December 2021 Update: All works have been completed along Strathcona and substantial completion has been awarded to the contractor, Contour Concrete Ltd. Streetlight bases and conduit are complete. Poles are to be delivered in the coming months as a result of supply chain delays in manufacturing and shipping.
Ask us your questions as we work through this project! We will install curbs, gutters, sidewalks, crosswalks, and street lighting along portions of the north side of Strathcona Road and the east side of Crystal Drive.
December 2021 Update: All works have been completed along Strathcona and substantial completion has been awarded to the contractor, Contour Concrete Ltd. Streetlight bases and conduit are complete. Poles are to be delivered in the coming months as a result of supply chain delays in manufacturing and shipping.
Submit your questions about the Strathcona and Crystal sidewalk installation project here.
-
Share Why wasn’t Clare Ave included in the sidewalk program? on Facebook Share Why wasn’t Clare Ave included in the sidewalk program? on Twitter Share Why wasn’t Clare Ave included in the sidewalk program? on Linkedin Email Why wasn’t Clare Ave included in the sidewalk program? link
Why wasn’t Clare Ave included in the sidewalk program?
Bertha asked over 3 years agoThank you for your email. The Strathcona and Crystal sidewalk project is funded through the City’s capital works budget and are prioritized mainly based on proximity to elementary schools, among other considerations. The 2021 annual budget was allocated to the Strathcona project and unfortunately additional funds weren’t available for other connections on Clare, Killarney, Kent, Fairfield Island, or other locations in Chilliwack frequented by pedestrians. Clare Ave has been added for future consideration and will be prioritized among other requests throughout the City.
If you haven’t already, please visit the Active Transportation page on EngageChilliwack.com and fill out the Active Transportation survey as the City will be using information collected as a future blueprint for pedestrian facilities.
Thank you.
-
Share Is there a minimum measurement between overhead span guyed pole and a fire-hydrant. thanx ,, SERGE on Facebook Share Is there a minimum measurement between overhead span guyed pole and a fire-hydrant. thanx ,, SERGE on Twitter Share Is there a minimum measurement between overhead span guyed pole and a fire-hydrant. thanx ,, SERGE on Linkedin Email Is there a minimum measurement between overhead span guyed pole and a fire-hydrant. thanx ,, SERGE link
Is there a minimum measurement between overhead span guyed pole and a fire-hydrant. thanx ,, SERGE
serge asked almost 4 years agoThank you for your email. A hydrant shall not be located within 3m of a utility pole. I am happy to attend the site to discuss your concerns; please feel welcome to phone me at 604-793-2907 or reach out by email at mcdiarmid@chilliwack.com to arrange a site visit and time that works with both of our schedules.
-
Share Re fire hydrant relocation to 46495 strathcona, At previous location Hydrant was located at or on property line at new location , hydrant location is 3-4 meters east of west property line, of above, Is there a standard, on location of hydrants. Thank -You"" Serge"" on Facebook Share Re fire hydrant relocation to 46495 strathcona, At previous location Hydrant was located at or on property line at new location , hydrant location is 3-4 meters east of west property line, of above, Is there a standard, on location of hydrants. Thank -You"" Serge"" on Twitter Share Re fire hydrant relocation to 46495 strathcona, At previous location Hydrant was located at or on property line at new location , hydrant location is 3-4 meters east of west property line, of above, Is there a standard, on location of hydrants. Thank -You"" Serge"" on Linkedin Email Re fire hydrant relocation to 46495 strathcona, At previous location Hydrant was located at or on property line at new location , hydrant location is 3-4 meters east of west property line, of above, Is there a standard, on location of hydrants. Thank -You"" Serge"" link
Re fire hydrant relocation to 46495 strathcona, At previous location Hydrant was located at or on property line at new location , hydrant location is 3-4 meters east of west property line, of above, Is there a standard, on location of hydrants. Thank -You"" Serge""
serge asked almost 4 years agoAt mid-block locations, fire hydrants shall be located at the property line and between adjacent properties where possible. At this particular location, it is not possible due to clearances from property boundaries, utility pole, street lighting and sidewalk clearances.
-
Share I understand there have been revisions on this project. can i view the revisions. on Facebook Share I understand there have been revisions on this project. can i view the revisions. on Twitter Share I understand there have been revisions on this project. can i view the revisions. on Linkedin Email I understand there have been revisions on this project. can i view the revisions. link
I understand there have been revisions on this project. can i view the revisions.
serge asked almost 4 years agoThank you for question. There have been some minor revisions since the public consultation. Based on resident feedback, the majority of sidewalk will continue along the edge of the roadway to maintain driveway space for existing residents; with the exception west of the school, and in front of the school, where parking pockets will remain. The City is working out final revisions with BC Hydro for the pole relocation and with the electrical contractor for the streetlighting locations. The City will share the drawings on this page in the near future once they are finalized.
-
Share I would like to know your plans for the existing overhead guy wire poles, thank- you on Facebook Share I would like to know your plans for the existing overhead guy wire poles, thank- you on Twitter Share I would like to know your plans for the existing overhead guy wire poles, thank- you on Linkedin Email I would like to know your plans for the existing overhead guy wire poles, thank- you link
I would like to know your plans for the existing overhead guy wire poles, thank- you
sergio babuin asked almost 4 years agoThank you for your question. The two poles in conflict with the sidewalk will be relocated further north within the right of way to accommodate the sidewalk. This will be completed as part of the sidewalk installation project.
Signup Banner
Timeline
-
February - June 2021
Ask Us About the Strathcona & Crystal Sidewalk Installation has finished this stageDesign
-
March - April 2021
Ask Us About the Strathcona & Crystal Sidewalk Installation has finished this stageInitial engagement with residents
-
May 2021
Ask Us About the Strathcona & Crystal Sidewalk Installation has finished this stageTendering
-
June 2021
Ask Us About the Strathcona & Crystal Sidewalk Installation has finished this stageAward project
-
June - July 2021
Ask Us About the Strathcona & Crystal Sidewalk Installation has finished this stageBegin construction
-
Before First Day of School
Ask Us About the Strathcona & Crystal Sidewalk Installation has finished this stageSidewalk, curb, and gutter completion
-
Winter 2021
Ask Us About the Strathcona & Crystal Sidewalk Installation is currently at this stageStreetlight installation (subject to delays in supply chain)
Who's Listening
-
Traffic Technician
Phone 604-793-2907 Email pipke@chilliwack.com